Special LevyIMPORTANT
A prior 2023 $110k+GST special levy funded remedial works, with any surplus kept in the Capital Works Fund. In 2025, owners approved an $800k (incl. GST) levy for Stage 1 façade remediation and, separately, a $100k+GST levy for Lot 9 floor-structure works; as of Aug 2025 the façade levy timing was still being finalised pending tenders.
Electric Vehicle Charging Plans
Back in 2022, the owners confirmed there were no utility supply agreements tied to EV charging. In 2025 the strata revisited the idea and kept an investigation/review of EV charging infrastructure options on the AGM agenda, but hasn’t approved a scope, timeline, or budget yet. For now, it remains a planning-stage discussion with no special levy or contract in place.
Insurance
The building renews its strata insurance each 1 July and has been moving to professional valuations and added management cover (Office Bearers’ Liability and Fidelity Guarantee). In March 2025 it was valued at $58M; owners approved a $185k insurance levy for 2025–26, obtained three quotes, and renewed from 1 July 2025 at $58M with $20M public liability.
LeaksIMPORTANT
Back in 2021, a bathroom leak affecting Lot 2 was flagged and hasn’t resurfaced in recent records. From 2022 onward, the strata shifted to a broader façade waterproofing program; Stage 1 (north/west waterproofing and sealant renewal) started March 2025 and is funded by an $800k special levy. As of Aug 2025, Stage 1 was on schedule and Stage 2 was still out to tender, with final scope/costs (and any further levy) pending.
Building EnvelopeIMPORTANT
After several years of façade investigation and planning, the strata moved into active remediation in March 2025, starting with Stage 1 waterproofing and sealant renewal to the north and west elevations, funded from the Capital Works Fund plus an $800,000 special levy (due Sept 2025 and Mar 2026). By mid‑2025 the works were progressing on schedule and terrace membrane touch-ups were completed. As of Aug 2025, the committee was reviewing tenders for Stage 2 and deciding whether to deliver it as one contract or staged annually, with further owner updates and any additional levy still to be confirmed.
Roof
In mid‑2024, the building tightened up roofwater maintenance by seeking a contractor for regular gutter cleaning. By July 2025, management also completed localized rooftop terrace membrane repairs as part of ongoing upkeep. Since then, there have been no further roof-related issues or follow-up works noted.
Mechanical Systems
Back in 2020, the owners approved a new A/C for Lot 10 under strict by-law compliance (licensed contractor, noise/appearance, waterproofing, no common-property impact). In 2024 the committee addressed routine electrical items—resetting external light timers and securing exposed A/C cabling under the building for safety. By the 2025 AGM there were still no special utility supply agreements, and a Lift 1 modernisation is flagged for 2026 planning (costs/decision pending).
Electrical
Back in 2020, the committee approved a lot owner’s air‑conditioning installation subject to licensed, by‑law compliant work. In 2024, the committee engaged the building’s preferred electrician to reset common-area light timers and arranged to secure exposed Lot 2 A/C cabling under the building to meet safety/common-property standards, with no costs recorded. By April 2025, the Owners Corporation confirmed there were no electricity/utility supply agreements needing review.
ElevatorsIMPORTANT
In March 2025, the owners flagged Lift 1 modernisation as a major 2026 project, and also tabled lift maintenance for discussion at the AGM. No costs or resolutions were set then, so it remains a planned upgrade rather than an approved contract. The main outstanding step is locking in scope, budget, and timing for Lift 1.
Fire SafetyIMPORTANT
Early on, the scheme had some lag in lodging its Annual Fire Safety Statement, so it moved to regular inspections/testing (Blue Flame) and tightened compliance processes. In 2023 it approved upgrades for non‑compliant fire doors and smoke alarms, and by 2024–2025 it was lodging the AFSS on schedule (latest 12 Mar 2025; next due Mar 2026). The next step is a planned fire indicator panel replacement in early 2026, with an engineering consultant to be appointed/supervise; costs haven’t been set.
Legal And Civil Resolution
From 2020 through 2022, the Owners Corporation put in place and reaffirmed a standing process to chase overdue strata levies: reminders, then their lawyers (Smith & Harper) can issue a proposed action notice and pursue court recovery/enforcement if needed. These resolutions set the framework only—no specific disputes, defendants, or cost budgets were recorded, suggesting routine governance rather than active litigation.